Too Big to Move!

Every project Hard Rock takes on is a custom project that requires experience and expertise.  This was once again evident at a project on the southeast side of Chicago after a fire had seemingly destroyed a building.  The first step of restoration was debris removal, and Hard Rock was called in.  The enormous pieces of rubble left after the fire had to be cut down so they could be removed.  Sections of roof that had collapsed as well as walls were in massive and irregular pieces and required both wall-sawing as well as wire-sawing.  After 4 weeks of hard work, Hard Rock was able to eliminate the area of debris to allow for restoration to take place.  

Projects like this are an example of the many projects we take on that not only require hard work, but they require expert planning and execution.  Without a plan going in, this project would have been a headache for far longer than 4 weeks.  Our project leaders and superintendents went in and immediately came up with a strategy that would get our customer what they needed.  Being able to work with our customers to come up with a plan, no matter how complex, and then execute is a huge reason Hard Rock has become a leader in this industry.  

Previous
Previous

187’ Radius, 18”.

Next
Next

Rain, Sleet or Snow.